Case Studies

Micro Turbine Test Bed Construction

Project:                                                Micro Turbine Test Bed Construction

Client:                  

Location:                                              Talinga

Duration:                                             3 Months

LTI/ MTI:                                              0

Recordable Incidents:                    0

Scope of Work:                                

The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of the Micro Turbine Test Bed.

 

Project Activities:                                            

  • Site Development and associated civil works,
  • Supply, manufacture and installation of all pipes and fittings
  • Supply, manufacture and installation of structural steel
  • Scheduling and co-ordination of both the off-site fabrication and on-site installation
  • Supply and installation of Hazardous Area electrical cable, glands &cable trays
  • Supply, manufacture and installation of Junction Boxes and Distribution Board
  • Installation of Heat Tracing and Load Banks
  • Installation and Termination of Instruments
  • Construction of 6 x Concrete slabs
  • Supply & Installation of Structural Grout
  • Supply and application of surface treatments
  • Hydrostatic test of installation
  • Procurement and Logistics
  • Supply and maintain full quality records, “as built” drawings and MDR
  • Installation Traceability Documentation
  • Project Management and Project Liaison with Client Representatives
  • Development and maintenance of Management Plans
  • Commissioning of Installation