Micro Turbine Test Bed Construction
Project: Micro Turbine Test Bed Construction
Client:
Location: Talinga
Duration: 3 Months
LTI/ MTI: 0
Recordable Incidents: 0
Scope of Work:
The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of the Micro Turbine Test Bed.
Project Activities:
- Site Development and associated civil works,
- Supply, manufacture and installation of all pipes and fittings
- Supply, manufacture and installation of structural steel
- Scheduling and co-ordination of both the off-site fabrication and on-site installation
- Supply and installation of Hazardous Area electrical cable, glands &cable trays
- Supply, manufacture and installation of Junction Boxes and Distribution Board
- Installation of Heat Tracing and Load Banks
- Installation and Termination of Instruments
- Construction of 6 x Concrete slabs
- Supply & Installation of Structural Grout
- Supply and application of surface treatments
- Hydrostatic test of installation
- Procurement and Logistics
- Supply and maintain full quality records, “as built” drawings and MDR
- Installation Traceability Documentation
- Project Management and Project Liaison with Client Representatives
- Development and maintenance of Management Plans
- Commissioning of Installation